The impact of multilayer subcontracting system in construction industry in Pahang
In construction industry, there is possibility for subcontractors to sublet their work to other subcontractors. It called multilayer subcontracting. Multilayer subcontracting has been identified as a source of poor time performance of projects in previous study. This study is about the impact of mul...
à®®à¯à®´à¯ விளகà¯à®•à®®à¯
Saved in:
| தலைமை எழà¯à®¤à¯à®¤à®¾à®³à®°à¯: | |
|---|---|
| வடிவமà¯: | Undergraduates Project Papers |
| வெளியீடபà¯à®ªà®Ÿà¯à®Ÿà®¤à¯: |
2013
|
| பகà¯à®¤à®¿à®•ளà¯: | |
| நிகழà¯à®¨à®¿à®²à¯ˆ அணà¯à®•லà¯: | http://iportal.ump.edu.my/lib/item?id=chamo:83188&theme=UMP2 http://iportal.ump.edu.my/lib/item?id=chamo:83188&theme=UMP2 http://umpir.ump.edu.my/9132/1/CD8476%20%40%2058.pdf |
| கà¯à®±à®¿à®¯à¯€à®Ÿà¯à®•ளà¯: |
கà¯à®±à®¿à®šà¯à®šà¯Šà®²à¯ இணை
கà¯à®±à®¿à®¯à¯€à®Ÿà¯à®•ள௠இலà¯à®²à¯ˆ, இநà¯à®¤ கà¯à®±à®¿à®šà¯à®šà¯Šà®²à¯à®²à¯ˆ à®®à¯à®¤à®²à®¿à®²à¯ பதிவ௠செயà¯à®¯à¯à®™à¯à®•ளà¯!
|
இநà¯à®¤ கரà¯à®¤à¯à®¤à¯ˆ à®®à¯à®¤à®²à®¿à®²à¯ விடà¯à®Ÿà¯à®šà¯à®šà¯†à®²à¯à®²à¯à®™à¯à®•ளà¯!