A Student On Basin Frame Production : A project Management Approach
This report is part of PSM (Projek Sarjana Muda). This project is about basin frame of portable toilet produced by Uleetech Engineering Sdn. Bhd. Analysis is done in two areas that are the process flow and the scheduling of the project to identify the weaknesses of current plan. Then, weaknesses...
à®®à¯à®´à¯ விளகà¯à®•à®®à¯
Saved in:
இநà¯à®¤ கரà¯à®¤à¯à®¤à¯ˆ à®®à¯à®¤à®²à®¿à®²à¯ விடà¯à®Ÿà¯à®šà¯à®šà¯†à®²à¯à®²à¯à®™à¯à®•ளà¯!