Time and cost performance of construction projects in Southern and Central Regions of Peninsular Malaysia
Time and cost performance is the fundamental criteria for success of any project. Unfortunately construction industry in Malaysia has been regarded as industry facing poor performance leading to failure in achieving effective time and cost performance. As a consequence most of the projects face huge...
Disimpan dalam:
| Pengarang-pengarang Utama: | , , , , |
|---|---|
| Format: | Conference or Workshop Item |
| Diterbitkan: |
2012
|
| Subjek-subjek: | |
| Capaian Atas Talian: | http://eprints.uthm.edu.my/3472/ http://eprints.uthm.edu.my/3472/1/p52%2Dabdul_rahman.pdf |
| Penanda-penanda: |
Tambah Penanda
Tiada Penanda, Jadilah orang pertama menanda rekod ini!
|