Determinants of contractor satistaction
Performance in the construction industry is increasingly scrutinized as a result of the delays, cost overruns and poor quality of the industry's products and services. Increasingly, disputes, conflicts and mismatches of objectives among participants are contributory factors. Performance measure...
à®®à¯à®´à¯ விளகà¯à®•à®®à¯
Saved in:
| தலைமை எழà¯à®¤à¯à®¤à®¾à®³à®°à¯à®•ளà¯: | , , |
|---|---|
| வடிவமà¯: | கடà¯à®Ÿà¯à®°à¯ˆ |
| வெளியீடபà¯à®ªà®Ÿà¯à®Ÿà®¤à¯: |
Routledge
2013
|
| பகà¯à®¤à®¿à®•ளà¯: | |
| நிகழà¯à®¨à®¿à®²à¯ˆ அணà¯à®•லà¯: | http://dx.doi.org/10.1080/01446193.2013.814919 http://dx.doi.org/10.1080/01446193.2013.814919 http://eprints.uthm.edu.my/4309/1/md_asrul_nasid_masrom_U.pdf |
| கà¯à®±à®¿à®¯à¯€à®Ÿà¯à®•ளà¯: |
கà¯à®±à®¿à®šà¯à®šà¯Šà®²à¯ இணை
கà¯à®±à®¿à®¯à¯€à®Ÿà¯à®•ள௠இலà¯à®²à¯ˆ, இநà¯à®¤ கà¯à®±à®¿à®šà¯à®šà¯Šà®²à¯à®²à¯ˆ à®®à¯à®¤à®²à®¿à®²à¯ பதிவ௠செயà¯à®¯à¯à®™à¯à®•ளà¯!
|