Optimize assembly production line using line balancing
This study aimed to production activity and the assembly line at the Company X. This study was conducted using qualitative and quantitative methods which are used to interview the production manager for information and collecting secondary data is used to determine the layout is flexible or not. Usi...
à®®à¯à®´à¯ விளகà¯à®•à®®à¯
Saved in:
| தலைமை எழà¯à®¤à¯à®¤à®¾à®³à®°à¯à®•ளà¯: | , , , |
|---|---|
| வடிவமà¯: | Conference or Workshop Item |
| வெளியீடபà¯à®ªà®Ÿà¯à®Ÿà®¤à¯: |
2013
|
| பகà¯à®¤à®¿à®•ளà¯: | |
| நிகழà¯à®¨à®¿à®²à¯ˆ அணà¯à®•லà¯: | http://eprints.uthm.edu.my/4430/ http://eprints.uthm.edu.my/4430/1/ICO032.pdf |
| கà¯à®±à®¿à®¯à¯€à®Ÿà¯à®•ளà¯: |
கà¯à®±à®¿à®šà¯à®šà¯Šà®²à¯ இணை
கà¯à®±à®¿à®¯à¯€à®Ÿà¯à®•ள௠இலà¯à®²à¯ˆ, இநà¯à®¤ கà¯à®±à®¿à®šà¯à®šà¯Šà®²à¯à®²à¯ˆ à®®à¯à®¤à®²à®¿à®²à¯ பதிவ௠செயà¯à®¯à¯à®™à¯à®•ளà¯!
|