Towards implementing reactive scheduling for job shop problem
Most of the research literature concerning scheduling concentrates on the static problems, i.e problems where all input data is known and does not change over time. However, the real world scheduling problems are very seldom static. Events like machine breakdown or bottleneck in some situation impos...
à®®à¯à®´à¯ விளகà¯à®•à®®à¯
Saved in:
| தலைமை எழà¯à®¤à¯à®¤à®¾à®³à®°à¯à®•ளà¯: | , |
|---|---|
| வடிவமà¯: | Conference or Workshop Item |
| மொழி: | English |
| வெளியீடபà¯à®ªà®Ÿà¯à®Ÿà®¤à¯: |
2006
|
| பகà¯à®¤à®¿à®•ளà¯: | |
| நிகழà¯à®¨à®¿à®²à¯ˆ அணà¯à®•லà¯: | http://eprints.utm.my/2276/ http://eprints.utm.my/2276/1/SafaaiDeris2006_TowardsImplementingReactiveScheduling.pdf |
| கà¯à®±à®¿à®¯à¯€à®Ÿà¯à®•ளà¯: |
கà¯à®±à®¿à®šà¯à®šà¯Šà®²à¯ இணை
கà¯à®±à®¿à®¯à¯€à®Ÿà¯à®•ள௠இலà¯à®²à¯ˆ, இநà¯à®¤ கà¯à®±à®¿à®šà¯à®šà¯Šà®²à¯à®²à¯ˆ à®®à¯à®¤à®²à®¿à®²à¯ பதிவ௠செயà¯à®¯à¯à®™à¯à®•ளà¯!
|