Abu Samah, M. (2006). Solving the MASUM sport league scheduling problem using hybrid genetic algorithm and constraint-based reasoning.
Petikan Gaya ChicagoAbu Samah, Mazlan. Solving the MASUM Sport League Scheduling Problem Using Hybrid Genetic Algorithm and Constraint-based Reasoning. 2006.
Petikan MLAAbu Samah, Mazlan. Solving the MASUM Sport League Scheduling Problem Using Hybrid Genetic Algorithm and Constraint-based Reasoning. 2006.
Amaran: Petikan-petikan ini tidak semestinya 100% tepat.