Wellbore pressure prediction after pipe connection operation in underbalanced drilling
In underbalanced drilling (UBD), bottom hole pressure (BHP) must be maintained in the defined limit. Maintaining underbalanced drilling conditions after pipe connection operation is required for the success of underbalanced drilling operations. Modeling and simulation of gas-liquid two phase flow in...
à®®à¯à®´à¯ விளகà¯à®•à®®à¯
Saved in:
| தலைமை எழà¯à®¤à¯à®¤à®¾à®³à®°à¯: | |
|---|---|
| வடிவமà¯: | Thesis |
| மொழி: | English |
| வெளியீடபà¯à®ªà®Ÿà¯à®Ÿà®¤à¯: |
2015
|
| பகà¯à®¤à®¿à®•ளà¯: | |
| நிகழà¯à®¨à®¿à®²à¯ˆ அணà¯à®•லà¯: | http://eprints.utm.my/54684/ http://eprints.utm.my/54684/1/RezaCheraghiKootianiPFChE2015.pdf |
| கà¯à®±à®¿à®¯à¯€à®Ÿà¯à®•ளà¯: |
கà¯à®±à®¿à®šà¯à®šà¯Šà®²à¯ இணை
கà¯à®±à®¿à®¯à¯€à®Ÿà¯à®•ள௠இலà¯à®²à¯ˆ, இநà¯à®¤ கà¯à®±à®¿à®šà¯à®šà¯Šà®²à¯à®²à¯ˆ à®®à¯à®¤à®²à®¿à®²à¯ பதிவ௠செயà¯à®¯à¯à®™à¯à®•ளà¯!
|
இநà¯à®¤ கரà¯à®¤à¯à®¤à¯ˆ à®®à¯à®¤à®²à®¿à®²à¯ விடà¯à®Ÿà¯à®šà¯à®šà¯†à®²à¯à®²à¯à®™à¯à®•ளà¯!