Ground improvement using SPVD and RPE
Excessive total and differential settlement at the intersection of a surcharged prefabricated vertical drain (SPVD) and a rigid piled embankment on soft ground during the post-construction period leads to considerable time and costs being spent on repetitive remedial works in the future. This paper...
Disimpan dalam:
| Pengarang-pengarang Utama: | , , , |
|---|---|
| Format: | Artikel |
| Diterbitkan: |
Springer Verlag
2017
|
| Subjek-subjek: | |
| Capaian Atas Talian: | http://eprints.utm.my/75366/ http://eprints.utm.my/75366/ |
| Penanda-penanda: |
Tambah Penanda
Tiada Penanda, Jadilah orang pertama menanda rekod ini!
|