The impact of equipment availability and reliability on mission outcomes : an initial look /
Saved in:
| தலைமை எழà¯à®¤à¯à®¤à®¾à®³à®°à¯: | Kelley, Charles T. |
|---|---|
| கà¯à®´à¯à®® எழà¯à®¤à¯à®¤à®¾à®³à®°à¯: | Arroyo Center. |
| வடிவமà¯: | பà¯à®¤à¯à®¤à®•ம௠|
| மொழி: | English |
| வெளியீடபà¯à®ªà®Ÿà¯à®Ÿà®¤à¯: |
Santa Monica, CA :
RAND Arroyo Center,
2004.
|
| தொகà¯à®¤à®¿: | Documented briefing (Rand Corporation) ;
DB-423-A. |
| பகà¯à®¤à®¿à®•ளà¯: | |
| கà¯à®±à®¿à®¯à¯€à®Ÿà¯à®•ளà¯: |
கà¯à®±à®¿à®šà¯à®šà¯Šà®²à¯ இணை
கà¯à®±à®¿à®¯à¯€à®Ÿà¯à®•ள௠இலà¯à®²à¯ˆ, இநà¯à®¤ கà¯à®±à®¿à®šà¯à®šà¯Šà®²à¯à®²à¯ˆ à®®à¯à®¤à®²à®¿à®²à¯ பதிவ௠செயà¯à®¯à¯à®™à¯à®•ளà¯!
|
இதே போனà¯à®± பொரà¯à®Ÿà¯à®•ளà¯
-
Combat service support transformation : emerging strategies for makng the power projection Army a reality / Eric Peltz, John Halliday, Steven L. Hartman.
மூலமà¯: Peltz, Eric, 1968-
வெளியீடபà¯à®ªà®Ÿà¯à®Ÿà®¤à¯: (2003) -
An Initial evaluation of the VISION assessment system : its relevance and application to national-level sustainment planning / Christopher L. Tsai, Patricia M. Boren, Robert S. Tripp.
மூலமà¯: Tsai, Christopher L., 1960-
வெளியீடபà¯à®ªà®Ÿà¯à®Ÿà®¤à¯: (1992) -
Evaluating the combat payoff of alternative logistics structures for high technology subsystems / Morton B. Berman ... [et al.].
வெளியீடபà¯à®ªà®Ÿà¯à®Ÿà®¤à¯: (1988) -
The VISION assessment system : Class IX sustainment planning / Christopher L. Tsai, Robert S. Tripp, Morton B. Berman.
மூலமà¯: Tsai, Christopher L., 1960-
வெளியீடபà¯à®ªà®Ÿà¯à®Ÿà®¤à¯: (1992) -
The concept of operations for a U.S. Army combat-oriented logistics execution system with VISION (Visibility of Support Options) / Robert S. Tripp, Morton B. Berman, Christopher L. Tsai.
மூலமà¯: Tripp, Robert S., 1944-
வெளியீடபà¯à®ªà®Ÿà¯à®Ÿà®¤à¯: (1990)


