Impacts of common components in multistage production system under uncertain conditions
The work desires: i) to determine the optimum level of batch size in bottleneck facility and ii) to analyze the effect of common components on work-in-process (WIP) level and cycle time in a multistage production system under uncertainties. The uncertainty is created by machine breakdown and qualit...
Disimpan dalam:
| Pengarang-pengarang Utama: | , , |
|---|---|
| Format: | Conference or Workshop Item |
| Diterbitkan: |
2010
|
| Subjek-subjek: | |
| Capaian Atas Talian: | http://eprints.um.edu.my/11274/ http://eprints.um.edu.my/11274/1/161_wazed.pdf |
| Penanda-penanda: |
Tambah Penanda
Tiada Penanda, Jadilah orang pertama menanda rekod ini!
|