The Implementation Of Risk Management At Aerospace Manufacturing Company : Case Study 2 (Process)

This study presents the “Implementation of Risk Management in Aerospace Manufacturing Company (Process)”. The process of risk management is carry out in XYZ Sdn. Bhd, Batu Berendam, Melaka. This company in the process of implementation risk management to avoid any potentials risk that will affect...

Full description

Saved in:
Bibliographic Details
Main Author: Mohd Aminudin , Abdullah
Format: Monograph
Published: UTeM 2010
Subjects:
Online Access:http://library.utem.edu.my:8000/elmu/index.jsp?module=webopac-d&action=graphicFullDisplayRetriever.jsp&szMaterialNo=0000063580
http://library.utem.edu.my:8000/elmu/index.jsp?module=webopac-d&action=graphicFullDisplayRetriever.jsp&szMaterialNo=0000063580
http://eprints.utem.edu.my/1640/1/The_Implementation_Of_Risk_Management_At_Aerospace_Manufacturing_Company_-_Case_Study_2__%28Process%29_-_24_pages.pdf
http://eprints.utem.edu.my/1640/2/The_Implementation_Of_Risk_Management_At_Aerospace_Manufacturing_Company_-_Case_Study_2__%28Process%29_-_Full_Text.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:This study presents the “Implementation of Risk Management in Aerospace Manufacturing Company (Process)”. The process of risk management is carry out in XYZ Sdn. Bhd, Batu Berendam, Melaka. This company in the process of implementation risk management to avoid any potentials risk that will affect the company mission, vision, and daily operation. Since there are several sections in XYZ Sdn. Bhd’s production floor, the processes in Cleanroom and Autoclave was selected because both sections are exposed with risk. The objectives of this study are to study the risk management, to implement risk management, and to measure the effectiveness of the implementation at this company. This report focuses on the process of managing risk in Cleanroom and Autoclave section using FMEA tool by followed the standard rating value for risk assessment from XYZ Sdn. Bhd. Besides that, methods such as training, brainstorming, and survey been used during the implementation of Risk Management. After analyzed the risks, the treatment plan were proposed in order to reduce the risk that in high and medium level to the low level. From the treatment plan, those risks had been analyzed for the second time in order to make sure whether the treatment plan is effectiveness or not. Lastly all the risks that had been treating are in low level that mean those risks in acceptable level and need to be monitor in the future.