Generation HVDC And Test On Insulator (Plywood)
The purpose of this project is to develop the Heafely type DC configuration, for high voltage testing. The new equipment which available in the high voltage lab will be used in order to study and analyzed the characteristics of high voltage. Several different level of high voltage will be tested. Ho...
Saved in:
| Main Author: | |
|---|---|
| Format: | Monograph |
| Published: |
UTeM
2008
|
| Subjects: | |
| Online Access: | http://library.utem.edu.my:8000/elmu/index.jsp?module=webopac-d&action=fullDisplayRetriever.jsp&szMaterialNo=0000052248 http://library.utem.edu.my:8000/elmu/index.jsp?module=webopac-d&action=fullDisplayRetriever.jsp&szMaterialNo=0000052248 http://eprints.utem.edu.my/3942/1/Generation_HVDC_And_Test_On_Insulator_%28Plywood%29_-_TK3441.P52.M72_2008.pdf http://eprints.utem.edu.my/3942/4/Generation_HVDC_And_Test_On_Insulator_%28Plywood%29_-_TK3441.P52.M72_2008.pdf |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| Summary: | The purpose of this project is to develop the Heafely type DC configuration, for high voltage testing. The new equipment which available in the high voltage lab will be used in order to study and analyzed the characteristics of high voltage. Several different level of high voltage will be tested. However, this project is focus on generation of high voltage direct current Beside that, the high voltage DC circuit should be study to determine how the circuits function and how the supply generate using „Half Wave rectifier‟ and „Greinacher Doubler-Circuit‟. The generation of high voltage also should be study before doing this project. The simulation using Pspice will be done in order to compare the test result with the experimental. In this project, insulator test also have been done to find insulator breakdown voltage. The plywood has been chosen because it easy to find and have potency to be an insulator. After the test, the characteristic of plywood and dielectric strength will be analysis. Conclusion of this project is to develop the testing procedure as a manual for laboratory learning process. |
|---|