Implementation Of SCADA (Supervisory Control And Data Acquisition) For FMS 200

This project is proposed the implementation of SCADA for FMS 200 which is located at Lab Automation. SCADA system is created for Flexible Manufacturing System and this system has 8 stations that use to assemble rotating mechanism. The form of SCADA usually refers to centralized system which is us...

Full description

Saved in:
Bibliographic Details
Main Author: Platini , Julius
Format: Monograph
Published: UTeM 2009
Subjects:
Online Access:http://library.utem.edu.my:8000/elmu/index.jsp?module=webopac-d&action=fullDisplayRetriever.jsp&szMaterialNo=0000054628
http://library.utem.edu.my:8000/elmu/index.jsp?module=webopac-d&action=fullDisplayRetriever.jsp&szMaterialNo=0000054628
http://eprints.utem.edu.my/4397/1/Implement_SCADA_%28Supervisory_Control_And_Data_Acquisition%29_For_FMS_200.pdf
http://eprints.utem.edu.my/4397/2/Implement_SCADA_%28Supervisory_Control_And_Data_Acquisition%29_For_FMS_200.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:This project is proposed the implementation of SCADA for FMS 200 which is located at Lab Automation. SCADA system is created for Flexible Manufacturing System and this system has 8 stations that use to assemble rotating mechanism. The form of SCADA usually refers to centralized system which is used to the monitor and control entire sites from one computer. Most of the FMS 200 control actions are performed automatically by programmable logic control before SCADA is being implemented to this system. Beside than, all the 8 stations is control manually from the sites by technician if error happen. For example likes resetting, starting and stopping or controlling any kind of activity of the system at the control panel of each station. By using SCADA, it can monitoring on quantity product being produce, air pressure existence, electric supply power, machine condition, products condition and product measurement. Apart from that, it also can control all the 8 station from the main computer without need to go each station to reset and activating the system if errors happen. As a conclusion, this project has been successfully done. By having this system, it will give benefit to human specially on monitoring system and equipment or machine in industry.