Application Of XY Table Continuous Motion Programming With PC Based Control
The project of application of XY table continuous motion programming with PC based control is divided in two parts. First part of the project is about proposal and the second part is about project implementation. The application of XY table continuous motion programming with PC based control stud...
Saved in:
| Main Author: | |
|---|---|
| Format: | Monograph |
| Published: |
UTeM
2009
|
| Subjects: | |
| Online Access: | http://library.utem.edu.my:8000/elmu/index.jsp?module=webopac-d&action=fullDisplayRetriever.jsp&szMaterialNo=0000053211 http://library.utem.edu.my:8000/elmu/index.jsp?module=webopac-d&action=fullDisplayRetriever.jsp&szMaterialNo=0000053211 http://eprints.utem.edu.my/4704/1/Application_Of_XY_Table_Continuous_Motion_Programming_With_Pc_Based_Control_-_24_pages.pdf http://eprints.utem.edu.my/4704/2/Application_Of_XY_Table_Continuous_Motion_Programming_With_Pc_Based_Control.pdf |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| Summary: | The project of application of XY table continuous motion programming with PC
based control is divided in two parts. First part of the project is about proposal and
the second part is about project implementation. The application of XY table
continuous motion programming with PC based control studied and investigated in
this project as an improvement of previous research in order to enable the XY table
for continuous motion. Further up, for high precision operation automation system
the current two axis system is inadequate. Thus the third axis called Z-axis should be
designed and added to the current XY positioning system. The continuous motion
programming with the third axis may solve the current XY positioning system
limitations in order to meet the current industrial automation requirements. This
project is will be conducted to modify the current design, improve the current system
in term of flow of programming method and mechanical structure. Finally a
comprehensive report produced to conclude the findings and results obtained by the
implementation of the project. |
|---|