SCADA-Supervisory Control and Data Acquisition Based On Electrical Load Controller
The project is used to monitor, control and supervise electrical loads or equipment. SCADA stands for Supervisory Control and Data Acquisition. As the name indicates, it is not a full control system, but rather focuses on the supervisory level. As such, it is a purely software package that is positi...
Saved in:
| Main Author: | |
|---|---|
| Format: | Monograph |
| Published: |
UTeM
2008
|
| Subjects: | |
| Online Access: | http://library.utem.edu.my:8000/elmu/index.jsp?module=webopac-d&action=fullDisplayRetriever.jsp&szMaterialNo=0000052273 http://library.utem.edu.my:8000/elmu/index.jsp?module=webopac-d&action=fullDisplayRetriever.jsp&szMaterialNo=0000052273 http://eprints.utem.edu.my/855/1/SCADA-Supervisory_Control_and_Data_Acquisition_Based_On_Electrical_Load_Controller_-_Muhammad_Firdaus_b_Md_Yusof_-_T58.6.M44_2008_24_Pages.pdf http://eprints.utem.edu.my/855/2/SCADA-Supervisory_Control_and_Data_Acquisition_Based_On_Electrical_Load_Controller_-_Muhammad_Firdaus_b_Md_Yusof_-_T58.6.M44_2008.pdf |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| Summary: | The project is used to monitor, control and supervise electrical loads or equipment. SCADA stands for Supervisory Control and Data Acquisition. As the name indicates, it is not a full control system, but rather focuses on the supervisory level. As such, it is a purely software package that is positioned on top of a hardware to which it is interfaced via RTU’s (Remote Terminal Units). Indusoft Web Studio is used as software for this project. The SCADA system supports the power system operator in controlling the remote or local terminal equipments such as opening or closing relays or circuit breaker with security features. Data are obtained from RTU’s installed in the automated electrical distribution panel and delivered at the system control centre by local I/O devices. |
|---|