End-of-life modelling for power transformers in aged power system networks

Although the design lifetime of transmission transformers was 40 years or less, operational experience has been very good with transformers up to this age, as the majority of transformers on National Grid’s UK system were installed between 1955 and 1975 it is important to understand and predict the...

Full description

Saved in:
Bibliographic Details
Main Authors: P. , Jarman, Z., Wang, Q. , Zhong, Ishak, Mohd Taufiq
Format: Conference or Workshop Item
Published: 2009
Subjects:
Online Access:http://eprints.uthm.edu.my/1712/
http://eprints.uthm.edu.my/1712/1/C105.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!