Improvement of the SAG ampacity carrying level of existing 275 kV overhead line tower by using the re-conductoring apporah

This project presents a methodological approach, suggestion and information in uprating the existing 275kV transmission overhead line by using the re-conductoring approach. Overhead transmission line conductors were given priority in information. Calculation regarding the maximum sag and maximum cur...

Full description

Saved in:
Bibliographic Details
Main Author: Mahmod, Luqman Hakim
Format: Thesis
Published: 2012
Subjects:
Online Access:http://eprints.uthm.edu.my/2920/
http://eprints.uthm.edu.my/2920/1/luqman_hakim_mahmod_1.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!