Improvement of the SAG ampacity carrying level of existing 275 kV overhead line tower by using the re-conductoring apporah
This project presents a methodological approach, suggestion and information in uprating the existing 275kV transmission overhead line by using the re-conductoring approach. Overhead transmission line conductors were given priority in information. Calculation regarding the maximum sag and maximum cur...
Disimpan dalam:
| Pengarang Utama: | |
|---|---|
| Format: | Thesis |
| Diterbitkan: |
2012
|
| Subjek-subjek: | |
| Capaian Atas Talian: | http://eprints.uthm.edu.my/2920/ http://eprints.uthm.edu.my/2920/1/luqman_hakim_mahmod_1.pdf |
| Penanda-penanda: |
Tambah Penanda
Tiada Penanda, Jadilah orang pertama menanda rekod ini!
|
Jadilah orang pertama meninggalkan komen!