Significant factors causing cost overruns in large construction projects in Malaysia

Once a construction projects fails in achieving effective cost performance, it will result to cost overruns. These overruns are caused from several factors which are very important to uncover for improving the cost performance. In Malaysia, not many research works have been carried out on studying c...

Full description

Saved in:
Bibliographic Details
Main Authors: Abdul Rahman, Ismail, Memon, Aftab Hameed, Abdul Karim, Ahmad Tarmizi
Format: Article
Published: Science Alert 2013
Subjects:
Online Access:http://dx.doi.org/10.3923/jas.2013.286.293
http://dx.doi.org/10.3923/jas.2013.286.293
http://eprints.uthm.edu.my/4306/1/ismail_abdul_rahman_2_U.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
Be the first to leave a comment!
You must be logged in first