Optimization algorithms for re-entrant flow shop scheduling heuristic using bottleneck approach
This project is an extension to the study of Bottleneck Adjacent Matching (BAM) in 2008, a research area related to re-entrant flow shop job scheduling with the aim of finding the shortest makespan of entire process. Sample operation took place at Cyber Manufacturing Center (CMC), UTHM with process...