Improvement of the sag ampacity carrying level of existing 275 KV overhead line tower by using the re-conductoring approach
Urban cities grown in population day by day, proportionally to the electricity demand. The existence of the right of ways and the decreasing of land space to build new overhead transmission line towers, other criterion had to be observed. Other than upgrading towers, re-conductoring can be pursued i...
Disimpan dalam:
| Pengarang-pengarang Utama: | , , , , |
|---|---|
| Format: | Conference or Workshop Item |
| Diterbitkan: |
2015
|
| Subjek-subjek: | |
| Capaian Atas Talian: | http://eprints.uthm.edu.my/7200/ http://eprints.uthm.edu.my/7200/1/IC3E_2015_submission_154.pdf |
| Penanda-penanda: |
Tambah Penanda
Tiada Penanda, Jadilah orang pertama menanda rekod ini!
|
Jadilah orang pertama meninggalkan komen!