Pump scheduling optimization model for water supply system using AWGA
The water supply system has a high operational cost associated with its operations. This is characteristically due to the operations of the pumps that consume significantly high amount of electric energy. In order to minimize the electric energy consumption and reduce the maintenance cost of the sys...
à®®à¯à®´à¯ விளகà¯à®•à®®à¯
Saved in:
| தலைமை எழà¯à®¤à¯à®¤à®¾à®³à®°à¯à®•ளà¯: | , |
|---|---|
| வடிவமà¯: | Conference or Workshop Item |
| வெளியீடபà¯à®ªà®Ÿà¯à®Ÿà®¤à¯: |
2013
|
| பகà¯à®¤à®¿à®•ளà¯: | |
| நிகழà¯à®¨à®¿à®²à¯ˆ அணà¯à®•லà¯: | http://eprints.utm.my/51264/ http://eprints.utm.my/51264/ |
| கà¯à®±à®¿à®¯à¯€à®Ÿà¯à®•ளà¯: |
கà¯à®±à®¿à®šà¯à®šà¯Šà®²à¯ இணை
கà¯à®±à®¿à®¯à¯€à®Ÿà¯à®•ள௠இலà¯à®²à¯ˆ, இநà¯à®¤ கà¯à®±à®¿à®šà¯à®šà¯Šà®²à¯à®²à¯ˆ à®®à¯à®¤à®²à®¿à®²à¯ பதிவ௠செயà¯à®¯à¯à®™à¯à®•ளà¯!
|