Pump scheduling optimization model for water supply system using AWGA

The water supply system has a high operational cost associated with its operations. This is characteristically due to the operations of the pumps that consume significantly high amount of electric energy. In order to minimize the electric energy consumption and reduce the maintenance cost of the sys...

Penerangan Penuh

Disimpan dalam:
Butiran Bibliografi
Pengarang-pengarang Utama: Folorunso, Taliha Abiodun, Ismail, Fatimah Sham
Format: Conference or Workshop Item
Diterbitkan: 2013
Subjek-subjek:
Capaian Atas Talian:http://eprints.utm.my/51264/
http://eprints.utm.my/51264/
Penanda-penanda: Tambah Penanda
Tiada Penanda, Jadilah orang pertama menanda rekod ini!
Jadilah orang pertama meninggalkan komen!
Anda perlu log masuk dahulu