Materials takeoff in building information modeling
Appropriate cost estimation, monitoring and controlling are the key point of construction project td succeed. 2D drawing has been a normal source of information and procedure since 1970's. The drawback of drawing based estimating however is its nature where it has limited information that is...
Saved in:
| Main Author: | |
|---|---|
| Format: | Undergraduates Project Papers |
| Published: |
2015
|
| Subjects: | |
| Online Access: | http://iportal.ump.edu.my/lib/item?id=chamo:88501&theme=UMP2 http://iportal.ump.edu.my/lib/item?id=chamo:88501&theme=UMP2 http://umpir.ump.edu.my/10852/1/MUHAMMAD%20SYAIFUL%20SAFWAN%20BIN%20NORDIN.PDF |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|