Materials takeoff in building information modeling

Appropriate cost estimation, monitoring and controlling are the key point of construction project td succeed. 2D drawing has been a normal source of information and procedure since 1970's. The drawback of drawing based estimating however is its nature where it has limited information that is...

Penerangan Penuh

Disimpan dalam:
Butiran Bibliografi
Pengarang Utama: Muhammad Syaiful Safwan , Nordin
Format: Undergraduates Project Papers
Diterbitkan: 2015
Subjek-subjek:
Capaian Atas Talian:http://iportal.ump.edu.my/lib/item?id=chamo:88501&theme=UMP2
http://iportal.ump.edu.my/lib/item?id=chamo:88501&theme=UMP2
http://umpir.ump.edu.my/10852/1/MUHAMMAD%20SYAIFUL%20SAFWAN%20BIN%20NORDIN.PDF
Penanda-penanda: Tambah Penanda
Tiada Penanda, Jadilah orang pertama menanda rekod ini!