Bottleneck adjacent matching 1 (bam1) heuristic for re-entrant flow shop with dominant machine
This paper presents a scheduling heuristic to minimize the makespan of a re-entrant flow shop using bottleneck analysis. The heuristic is specifically intended for the cyber manufacturing centre (CMC) which is an Internet-based collaborative design and manufacturing between the Universiti Tun Hussei...
Saved in:
| Main Authors: | , |
|---|---|
| Format: | Conference or Workshop Item |
| Published: |
2008
|
| Subjects: | |
| Online Access: | http://eprints.uthm.edu.my/2256/ http://eprints.uthm.edu.my/2256/1/ICCIE2008.pdf |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|