Bottleneck adjacent matching 3 (BAM3) heuristic for re-entrant flow shop with dominant machine
This paper presents a scheduling heuristic to minimize the makespan of a re-entrant flow shop using bottleneck analysis. The heuristic is specifically intended for the cyber manufacturing centre (CMC) which is an Internet-based collaborative design and manufacturing between the Universiti Tun Hussei...
Saved in:
| Main Authors: | , |
|---|---|
| Format: | Article |
| Published: |
2008
|
| Subjects: | |
| Online Access: | http://ieeexplore.ieee.org/stamp/stamp.jsp?tp=&arnumber=4737848 http://ieeexplore.ieee.org/stamp/stamp.jsp?tp=&arnumber=4737848 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|