Bottleneck adjacent matching 3 (BAM3) heuristic for re-entrant flow shop with dominant machine
This paper presents a scheduling heuristic to minimize the makespan of a re-entrant flow shop using bottleneck analysis. The heuristic is specifically intended for the cyber manufacturing centre (CMC) which is an Internet-based collaborative design and manufacturing between the Universiti Tun Hussei...
à®®à¯à®´à¯ விளகà¯à®•à®®à¯
Saved in:
| தலைமை எழà¯à®¤à¯à®¤à®¾à®³à®°à¯à®•ளà¯: | , |
|---|---|
| வடிவமà¯: | கடà¯à®Ÿà¯à®°à¯ˆ |
| வெளியீடபà¯à®ªà®Ÿà¯à®Ÿà®¤à¯: |
2008
|
| பகà¯à®¤à®¿à®•ளà¯: | |
| நிகழà¯à®¨à®¿à®²à¯ˆ அணà¯à®•லà¯: | http://ieeexplore.ieee.org/stamp/stamp.jsp?tp=&arnumber=4737848 http://ieeexplore.ieee.org/stamp/stamp.jsp?tp=&arnumber=4737848 |
| கà¯à®±à®¿à®¯à¯€à®Ÿà¯à®•ளà¯: |
கà¯à®±à®¿à®šà¯à®šà¯Šà®²à¯ இணை
கà¯à®±à®¿à®¯à¯€à®Ÿà¯à®•ள௠இலà¯à®²à¯ˆ, இநà¯à®¤ கà¯à®±à®¿à®šà¯à®šà¯Šà®²à¯à®²à¯ˆ à®®à¯à®¤à®²à®¿à®²à¯ பதிவ௠செயà¯à®¯à¯à®™à¯à®•ளà¯!
|