Performance evaluation of M3 bottleneck based heuristic for M1M2M3 flow shop

This project investigates the possibility of developing scheduling heuristic using bottleneck approach for a three machine flow shop scheduling with the tendency of dominant machine at the first process. Due to the re-entrant and permutation nature of the process routing, the actual bottlenecks were...

全面介绍

Saved in:
书目详细资料
Main Authors: Md Amin Hamzas, Mohd Fidzwan, Ahmad Bareduan, Salleh, Hussin, M. S., Hasnul, M. J., Sanuddin, Asmawi, Zailani, Z. A.
格式: Article
出版: Praise Worthy Prize 2012
主题:
在线阅读:https://www.researchgate.net/publication/288107520_Performance_evaluation_of_m3_bottleneck_based_heuristic_for_M1M2M3_flow_shop
https://www.researchgate.net/publication/288107520_Performance_evaluation_of_m3_bottleneck_based_heuristic_for_M1M2M3_flow_shop
标签: 添加标签
没有标签, 成为第一个标记此记录!