Performance evaluation of M3 bottleneck based heuristic for M1M2M3 flow shop
This project investigates the possibility of developing scheduling heuristic using bottleneck approach for a three machine flow shop scheduling with the tendency of dominant machine at the first process. Due to the re-entrant and permutation nature of the process routing, the actual bottlenecks were...
à®®à¯à®´à¯ விளகà¯à®•à®®à¯
Saved in:
| தலைமை எழà¯à®¤à¯à®¤à®¾à®³à®°à¯à®•ளà¯: | , , , , , |
|---|---|
| வடிவமà¯: | கடà¯à®Ÿà¯à®°à¯ˆ |
| வெளியீடபà¯à®ªà®Ÿà¯à®Ÿà®¤à¯: |
Praise Worthy Prize
2012
|
| பகà¯à®¤à®¿à®•ளà¯: | |
| நிகழà¯à®¨à®¿à®²à¯ˆ அணà¯à®•லà¯: | https://www.researchgate.net/publication/288107520_Performance_evaluation_of_m3_bottleneck_based_heuristic_for_M1M2M3_flow_shop https://www.researchgate.net/publication/288107520_Performance_evaluation_of_m3_bottleneck_based_heuristic_for_M1M2M3_flow_shop |
| கà¯à®±à®¿à®¯à¯€à®Ÿà¯à®•ளà¯: |
கà¯à®±à®¿à®šà¯à®šà¯Šà®²à¯ இணை
கà¯à®±à®¿à®¯à¯€à®Ÿà¯à®•ள௠இலà¯à®²à¯ˆ, இநà¯à®¤ கà¯à®±à®¿à®šà¯à®šà¯Šà®²à¯à®²à¯ˆ à®®à¯à®¤à®²à®¿à®²à¯ பதிவ௠செயà¯à®¯à¯à®™à¯à®•ளà¯!
|
இநà¯à®¤ கரà¯à®¤à¯à®¤à¯ˆ à®®à¯à®¤à®²à®¿à®²à¯ விடà¯à®Ÿà¯à®šà¯à®šà¯†à®²à¯à®²à¯à®™à¯à®•ளà¯!