Bottleneck adjacent matching 3 (BAM3) heuristic for re-entrant flow shop with dominant machine
This paper presents a scheduling heuristic to minimize the makespan of a re-entrant flow shop using bottleneck analysis. The heuristic is specifically intended for the cyber manufacturing centre (CMC) which is an Internetbased collaborative design and manufacturing between the Universiti Tun Hussein...
Saved in:
| Main Authors: | , |
|---|---|
| Format: | Conference or Workshop Item |
| Subjects: | |
| Online Access: | http://eprints.uthm.edu.my/258/ http://eprints.uthm.edu.my/258/1/s_a_bareduan.pdf |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Be the first to leave a comment!