Bottleneck adjacent matching 3 (BAM3) heuristic for re-entrant flow shop with dominant machine
This paper presents a scheduling heuristic to minimize the makespan of a re-entrant flow shop using bottleneck analysis. The heuristic is specifically intended for the cyber manufacturing centre (CMC) which is an Internetbased collaborative design and manufacturing between the Universiti Tun Hussein...
Disimpan dalam:
| Pengarang-pengarang Utama: | , |
|---|---|
| Format: | Conference or Workshop Item |
| Subjek-subjek: | |
| Capaian Atas Talian: | http://eprints.uthm.edu.my/258/ http://eprints.uthm.edu.my/258/1/s_a_bareduan.pdf |
| Penanda-penanda: |
Tambah Penanda
Tiada Penanda, Jadilah orang pertama menanda rekod ini!
|
Jadilah orang pertama meninggalkan komen!