Bottleneck adjacent matching 3 (BAM3) heuristic for re-entrant flow shop with dominant machine

This paper presents a scheduling heuristic to minimize the makespan of a re-entrant flow shop using bottleneck analysis. The heuristic is specifically intended for the cyber manufacturing centre (CMC) which is an Internetbased collaborative design and manufacturing between the Universiti Tun Hussein...

Penerangan Penuh

Disimpan dalam:
Butiran Bibliografi
Pengarang-pengarang Utama: S. A. , Bareduan, S. H., Hasan
Format: Conference or Workshop Item
Subjek-subjek:
Capaian Atas Talian:http://eprints.uthm.edu.my/258/
http://eprints.uthm.edu.my/258/1/s_a_bareduan.pdf
Penanda-penanda: Tambah Penanda
Tiada Penanda, Jadilah orang pertama menanda rekod ini!
Jadilah orang pertama meninggalkan komen!
Anda perlu log masuk dahulu