Bottleneck adjacent matching 4 (BAM4) heuristic for re-entrant flow shop with dominant machine
This paper presents the second version of scheduling heuristic to minimize the makespan of a reentrant flow shop with dominant characteristic at first process. The processes scheduling resembles a four machine permutation re-entrant flow shop with the process routing of M1,M2,M3,M4,M3,M4 in which th...
Saved in:
| Main Authors: | , |
|---|---|
| Format: | Article |
| Published: |
IEEE
|
| Subjects: | |
| Online Access: | http://ieeexplore.ieee.org http://ieeexplore.ieee.org http://eprints.uthm.edu.my/260/1/s_a_bareduan_2.pdf |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|