Bottleneck adjacent matching 4 (BAM4) heuristic for re-entrant flow shop with dominant machine
This paper presents the second version of scheduling heuristic to minimize the makespan of a reentrant flow shop with dominant characteristic at first process. The processes scheduling resembles a four machine permutation re-entrant flow shop with the process routing of M1,M2,M3,M4,M3,M4 in which th...
Disimpan dalam:
| Pengarang-pengarang Utama: | , |
|---|---|
| Format: | Artikel |
| Diterbitkan: |
IEEE
|
| Subjek-subjek: | |
| Capaian Atas Talian: | http://ieeexplore.ieee.org http://ieeexplore.ieee.org http://eprints.uthm.edu.my/260/1/s_a_bareduan_2.pdf |
| Penanda-penanda: |
Tambah Penanda
Tiada Penanda, Jadilah orang pertama menanda rekod ini!
|
Jadilah orang pertama meninggalkan komen!