Bottleneck adjacent matching 3 (BAM3) heuristic for re-entrant flow shop with dominant machine
This paper presents a scheduling heuristic to minimize the makespan of a re-entrant flow shop using bottleneck analysis. The heuristic is specifically intended for the cyber manufacturing centre (CMC) which is an Internet-based collaborative design and manufacturing between the Universiti Tun Hussei...