Relevancy of factors and mitigation measures in controlling time and cost overrun towards Malaysian Environment

Construction projects are facing time and cost overrun globally. Since, this problem occurs due to various factors, hence for achieving successful construction projects, it is very important to control the responsible factors causing time and cost overrun. This study assessed the relevancy for each...

Full description

Saved in:
Bibliographic Details
Main Authors: Roslan, Nadzirah, Zainun, Noor Yasmin, Memon, Aftab Hameed
Format: Article
Published: Trans Tech Publications Inc 2015
Subjects:
Online Access:http://dx.doi.org/10.4028/www.scientific.net/AMM.773-774.1007
http://dx.doi.org/10.4028/www.scientific.net/AMM.773-774.1007
http://eprints.uthm.edu.my/6997/1/noor_yasmin_zainun_U_3.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!