Relevancy of factors and mitigation measures in controlling time and cost overrun towards Malaysian Environment
Construction projects are facing time and cost overrun globally. Since, this problem occurs due to various factors, hence for achieving successful construction projects, it is very important to control the responsible factors causing time and cost overrun. This study assessed the relevancy for each...
Saved in:
| Main Authors: | , , |
|---|---|
| Format: | Article |
| Published: |
Trans Tech Publications Inc
2015
|
| Subjects: | |
| Online Access: | http://dx.doi.org/10.4028/www.scientific.net/AMM.773-774.1007 http://dx.doi.org/10.4028/www.scientific.net/AMM.773-774.1007 http://eprints.uthm.edu.my/6997/1/noor_yasmin_zainun_U_3.pdf |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Be the first to leave a comment!