Relevancy of factors and mitigation measures in controlling time and cost overrun towards Malaysian Environment
Construction projects are facing time and cost overrun globally. Since, this problem occurs due to various factors, hence for achieving successful construction projects, it is very important to control the responsible factors causing time and cost overrun. This study assessed the relevancy for each...
Saved in:
| Main Authors: | , , |
|---|---|
| Format: | Article |
| Published: |
Trans Tech Publications Inc
2015
|
| Subjects: | |
| Online Access: | http://dx.doi.org/10.4028/www.scientific.net/AMM.773-774.1007 http://dx.doi.org/10.4028/www.scientific.net/AMM.773-774.1007 http://eprints.uthm.edu.my/6997/1/noor_yasmin_zainun_U_3.pdf |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| Summary: | Construction projects are facing time and cost overrun globally. Since, this problem
occurs due to various factors, hence for achieving successful construction projects, it is very
important to control the responsible factors causing time and cost overrun. This study assessed the
relevancy for each mitigation measures in relation with causative factors of time and cost overrun in
Malaysian construction projects. A total of 56 mitigation measures were identified and correlated
with the critical factors of time and cost overrun which were categorized into four phases of project
life cycle. Data collection was done by conducting structured interviews amongst the experienced
practitioners of the southern regions of Peninsular Malaysia. |
|---|